A  T  R  E  G
 

 
 

CAMPUS & BUILDINGS OVERVIEW

Total land size: approximately 25 acres including 8 acres to develop a mirror image fab for future growth.

Construction: All buildings constructed in 1995 with the RO /DI building expanded in 1998 (HF Waste Treatment system added) and the Generator Building expanded in 1999 (Electrical switchgear put under cover). Administration Building is concrete tilt-up walls with steel columns, girders & beams and plywood roof deck with lateral force resisting system consisting of metal floor diaphragms and concrete tilt-up shear walls, Fabrication Building is the same type of construction but with a metal roof, insulating concrete, rigid insulation and specially designed internal and external shear walls. Out-buildings; Energy Center, RO DI and Generator Building are the same type of construction as the Administration but with metal roof deck and insulating concrete and rigid insulation. Switchgear building is steel columns, girders and beams with metal roof and siding.



         

     
     

©
Copyright ATREG 2010
Colliers International - All Rights Reserved
601 Union Street, Suite 5300
Seattle, WA  98101